Whether you're upgrading to a rainfall shower, swapping a bath for a walk-in enclosure or starting from scratch, we'll plan the pipework around your layout and your water pressure.
What's included
- Electric, mixer, power and rainfall showers
- Baths, walk-in enclosures and wet room plumbing
- Toilets, basins, vanity units and taps
- Heated towel rails
- Full bathroom refits plumbed from first fix to finish
- Waste, pipework and pressure problems sorted
Popular bathroom jobs
- Replacing an old or weak shower
- Swapping a bath for a walk-in shower
- Fixing a running or leaking toilet
- Adding a heated towel rail
- Complete bathroom refit
Pricing
Small jobs like new taps or a toilet can often be done the same week. Larger refits are priced after a free visit so we can see the space and your water pressure.
Bathroom plumbing FAQs
Will a new shower work with my water pressure?
We check your pressure and hot water system first and recommend a shower that will actually perform, whether that's a mixer, a power shower or an electric shower.
Do you do the tiling too?
We focus on the plumbing and work alongside trusted local tilers and fitters for complete refits, so you only deal with one point of contact.
How long does a bathroom refit take?
A typical full bathroom refit takes around one to two weeks depending on the size and finish. We'll give you a timeline with your quote.


